As the walls of our new building inexorably rise, new layers of scaffolding appear; external details in stone are gradually being filled in; and now the next concrete floor has been installed. Our pictures show the pre-made concrete slabs for the floor of this third level being lowered by crane. And already now building has started above them. This will be (from the North) the upstairs level of our new guest house.